Java Integrated Industrial and Ports Estate

Kawasan Ekonomi Khusus, Gresik, East-Java - Indonesia

kawasan industri gresik jiipe

Articles & News About the Industrial Zone JIIPE in Gresik

Application of 5R (5S) in the Jiipe Industrial Zone

Application of 5R (5S) in the Jiipe Industrial Zone

You must be wondering, what is 5R (5S)? 5R (5S) is a method used by the Jiipe Industrial Estate to manage / manage the Jiipe Industrial Estate to become a better workplace in a sustainable manner. The aim is to improve efficiency and quality in the Jiipe Industrial Zone. The 5R (5S) culture has now been widely applied in many companies, as evidenced by the application of the 5R (5S) culture, the Jiipe Industrial Zone has grown to become a developed and highly competitive company.

The benefits of implementing the 5R (5S) culture in the Jiipe Industrial Zone include:

1. Increase productivity due to more efficient regulation of Industrial Estates.

2. Increasing comfort because the Industrial Estate is always clean and spacious.

3. Reducing the danger in Industrial Estates because of the good quality of Industrial Estates.

4. Add savings because it eliminates various wastes in Industrial Estates.


Copper and Gold Downstream Processing at Gresik-JIIPE SEZ Reinforces Industrial Integration as National Downstream Drive Continues

Following the simultaneous groundbreaking of Phase II downstream projects inaugurated by President of the Republic of Indones...

JIIPE Accelerates Green Industrial Investment with US$600 Million Melamine Project

Java Integrated Industrial and Port Estate (JIIPE), one of Indonesia’s leading Special Economic Zones (SEZ)...


Appointment for Industrial Land Acquisition /
Request for Proposal

This form is only for businesses genuinely interested in acquiring industrial land within JIIPE SEZ.
Please provide accurate details to help us assess your needs and offer the best solutions.

All fields marked with an asterisk (*) are mandatory

Basic Information

The reason for considering JIIPE ? *
(Ha)

Energy & Utility Needs
MW
m³/day
MMBTU/annum
Tons/Year