Java Integrated Industrial and Ports Estate

Kawasan Ekonomi Khusus, Gresik, East-Java - Indonesia

kawasan industri gresik jiipe

JIIPE Industrial Estate

Industrial Area | 1761 ha land area

Competitive and Sustainable Utilities

Eco-friendly environment of 1761 hectares area, offering complete utilities and amenities. Located strategically to be trading hub and manufacturing center for Indonesia and Asia Pacific. An integrated flood-free complex with lush and green residential estate and the deepest sea port in East Java Province.

Industrial Area Clustering:

kawasan industri gresik jiipe

JIIPE Industrial Estate`s Featured Features in Gresik

Complete Facilities and Infrastructure Complete Facilities and Infrastructure
  • International standard road system, with ROW 80 m, 50 m, 30m
  • Lots for heavy, medium and light industries
  • Office building and commercial area
  • Direct piping connection and conveyor
  • Bonded Zone, Bonded Logistic Center & Bonded Warehouse
  • Single window processing system for ease of doing business
  • Direct construction license (KLIK)
Logistics Efficiency Planning Logistics Efficiency Planning
  • Well-planned clustering to avoid contamination and enhance operation sustainability.
  • Pipe racks and liquid jetty to support liquid based industries
  • Logistics cost for incoming raw materials and distribution of finished goods will be competitive with utilization of JIIPE 3 modes of sea and land connectivity (deep- sea port, railway, toll road)
Connectivity Connectivity
  • Deep-sea port –16 LWS.
  • Direct toll road connection from Surabaya as the second largest city in Indonesia.
  • Double track railway access, connected to access points in Java Island
kawasan industri gresik jiipe

Energy Sources and Advanced Processing Facilities in JIIPE Industrial Estates

Power Plant

Gas power plant with combined cycle system, efficient and flexible with low emission in minimizing the environmental impact and giving the best quality.

  • Electricity
    PHASE 1 – 3 x 7.65 MW Dual Fuel Gas/MFO using the latest technology from Wartsila, Finland

    PHASE 2 – 500 MW Gas Turbine (operation in year 2021)

    PHASE 3 – 660 MW

  • Gas
    PHASE 1 – Supply from PGN (Perusahaan Gas Negara) since year 2018

PHASE 2 – LNG Receiving Terminal

Water Treatment Plant

We supply industrial water with best equipment, system and service to improve your operational reliability, reduce your production cost and support environmental compliance with:

  • Phase 1 – Capacity 100m3/hour (2019)
  • Phase 2 – Capacity 3600m3/hour (2021)
  • Phase 3 – Capacity 3600m3/hour (2025)
  • Water harvesting system with 7 water reservoirs of 42 hectares

Waste Water Treatment Plant

  • PHASE 1 – Industrial Waste Water Treatment (WWTP) with 2,500 m3 per day.
  • Waste water collection Pipeline in Block E.
kawasan industri gresik jiipe

Efficiency of Business Opening in JIIPE Gresik Industrial Area

Single Window Processing System

Single Window Processing System

3 Hour Service from Indonesia Investment Coordinating Board for initial approval and licensing process. JIIPE facilitates industrial investors to the related parties for permits and licensing requirements.

Direct Construction License

Direct Construction License

Utilizing Direct Construction License from Indonesia Investment Coordination Board, industrial tenants could build their factories and right after their construction design is approved by JIIPE Estate Management, in parallel processing their building permit.

Industrial Zoning

Industrial Zoning

  • Combined zone for manufacturing industry
  • Combined zone for warehousing
  • Combined zone for logistics center

빠른 예약 / 제안 요청

자바 통합 산업 및 항구 단지(JIIPE)에 오신 것을 환영합니다.

귀하의 비즈니스를 파악하고 문의에 답할 수 있도록 다음 정보를 기입해 주십시오.

별표(*)가 있는 항목은 필수 항목입니다.

All fields marked with an asterisk (*) are mandatory

기본 정보

JIIPE를 고려하는 이유 *