Java Integrated Industrial and Ports Estate

Kawasan Ekonomi Khusus, Gresik, East-Java - Indonesia

kawasan industri gresik jiipe

Articles & News About the Industrial Zone JIIPE in Gresik

Nine Industries are Ready to Become Tenants of the Jiipe Industrial Area

Nine Industries are Ready to Become Tenants of the Jiipe Industrial Area

Nine industries are ready to become tenants (tenants) and occupy industrial estates (JIIPE) in Manyar, Gresik, East Java. Two industries are already operating, four are still in the works stage, and three are in preparation, said PT AKR Corporindo TBK President Director Haryanto Adikoesoemo.

Two industries that are already operating are PT Clariant Indonesia's chemical factory and PT Unicahem Candi Indonesia's salt factory. Then, four more companies in the process of development are fertilizer company PT Hextar Fertilizer Indonesia, concrete and construction company PT Adhimix Precast Indonesia, PT Nippon Indosari Corporindo Tbk or Sari Roti, and PT CML, Haryanto Adikoesoemo explained.

JIIPE is the largest industrial estate in East Java, with a total area of 2,961 hectares. In addition, an industrial area of 1,800 hectares, JIIPE is also equipped with other areas. Such as a residential area of 800 hectares and a port area of 400 hectares.

Pelindo III Director of Engineering and Information Technology Husein Latief explained, during 2016 alone, this port had served 500 thousand tons of 25 ships in dry bulk and general cargo. The seaport in the industrial estate at JIIPE will be equipped with four docks capable of supporting all activities at the port and industry.


그레식-JIIPE 경제특구 구리·금 다운스트림 가공, 국가 다운스트림 정책 연속선상에서 산업 통합 강화

인도네시아 공화국 프라보워 수비안토(Prabowo Subianto) 대통령이 주재한 제2단계 다운스트림 사...

JIIPE, 6억 달러 규모 멜라민 프로젝트로 친환경 산업 투자 가속화

인도네시아를 대표하는 경제특구 중 하나인 자바 통합 산업 및 항만 단지(JIIPE)는 Golden El...


산업용지 취득 예약 / 제안 요청서

이 양식은 JIIPE SEZ 내에서 산업용지 취득에 진정으로 관심 있는 기업을 위한 것입니다. 당사의 요구사항을 평가하고 최적의 솔루션을 제공하기 위해 정확한 정보를 제공해 주시기 바랍니다.

All fields marked with an asterisk (*) are mandatory

기본 정보

JIIPE를 고려하는 이유 *
(Ha)

필요한 에너지 및 유틸리티
MW
m³/day
MMBTU/annum
Tons/Year